IAE Academy

GATE 2025 EE Q.64: solution and answer

GATE 2025 · EEQ.64 · 2 marks · NAT

Two units, rated at 100 MW and 150 MW, are enabled for economic load dispatch. When the overall incremental cost is 10,000 Rs./MWh, the units are dispatched to 50 MW and 80 MW respectively. At an overall incremental cost of 10,600 Rs./MWh, the power output of the units are 80 MW and 92 MW, respectively. The total plant MW-output (without overloading any unit) at an overall incremental cost of 11,800 Rs./MWh is ________ (round off to the nearest integer).

See the question in the paper

Answer and solution

ANSWER

The total plant output at an incremental cost of 11,800 Rs./MWh is 216 MW.

Official answer: 216Source: Official answer key, GATE 2025 EE (IIT Roorkee)

  1. Each unit has a linear incremental cost curve, so its output varies linearly with the system incremental cost (while it is within its limits): , with and the output at that .

  2. Unit 1 slope from the two given operating points: .

  3. Unit 2 slope: .

  4. At the increase over the first point is .

  5. Unit 1, unconstrained: . This exceeds its 100 MW rating, and the question says no unit may be overloaded, so .

  6. Unit 2: , which is within its 150 MW rating, so it stays as calculated.

  7. Total plant output: .

KEY IDEA

With linear incremental cost curves, each unit's output is a linear function of the common . Find each slope from the two given points, extrapolate to the new , then clamp any unit that passes its rating at that rating.

WATCH OUT FOR

Adding the unclamped outputs, MW, and so overloading the 100 MW unit. A unit that reaches its limit stays at the limit.

From the GATE 2025 EE paper. Every question of this paper · Download the full paper · All 9 Dispatch & control questions, with notes

More Dispatch & control questions